The original deck:
Move In Day |
Phase one of replacing the stained wood with Trex decking and glass railings:
Removing the walkway along the side of the garage, reinforcing the supports:
Dark Trex along the edges with a lighter brown plank:
Trim around the bay window |
Fixing the uneven spacing of the planks so that all boards are in long, symmetrical runs:
Straight runs of long boards |
Eventually one long visual line from one end of the deck to the other |
What do you do with all your scrap wood?? Give the shorter pieces to your family so they can build a dock at their pond. With the longer pieces...build a tree house!!
No comments:
Post a Comment